Inspect and test; Then do the documentation. It is very difficult to solve problems when the length of the cables is unknown, where they are headed or what results the tests originally gave. Therefore, keep good documentation. Smart users need it and they already know that they will pay an additional fee for good documentation.

Should you complete the field terminations?

Many manufacturers offer prefabricated wiring systems for internal and external plant installations. In fact, the largest application of prefabricated systems is that for fiber-to-home (FTTH) installations, which saves a lot of installation time and costs. To use prefabricated systems you need to know exactly where the cable will be laid, so you can specify the length of the cables. Through the use of CAD systems (computer-aided design) and design graphics, complete wiring is designed according to customer specifications and assembled at the factory using standard components. The old prefabricated systems (some are still available) were only cables with the terminations in place, with standard ST or SC connectors, protected with a plastic boot with a drag loop attached to the fiber reinforcement elements. The cable was placed with the boot in place and then it was removed to connect the cable to the connection panels.
Fiber optic installer pay
Nowadays it is more common to use backbone network cables ( backbone) with small MTP multifiber connectors that are pulled from one room to the other and connected to rack modules that have MTP connectors on the back and single-mode connectors on the front; and as in everything, this has its compensation, factory assembled connectors generally have fewer losses than field terminations, but MTP connectors, even those assembled at the factory, are not low loss, so the total loss can be greater than that of field-terminated systems. The costs also have their compensation, since the prefabricated systems are more expensive but the installation time is much shorter. In the new buildings,

No comments:

Post a Comment